The Asphalt Project Manager has responsibility for coordinating schedules and material flow with Sunrock general superintendents, customers, and the subcontractor workforce to ensure profitable projects. The role is responsible for communicating, both internally and externally, the status of projects. Additional responsibilities include consolidating and documenting all billing information on a routine basis. The position receives guidance with respect to general objectives. In the majority of tasks and projects assigned, the incumbent determines methods, work sequence, scheduling, and how to achieve objectives of assignments while operating within specific policy guidelines. The individual will practice absolute confidentiality. Good judgment and common sense is required in all duties and any other tasks as assigned. The normal office hours are 8am – 5:00pm Monday through Friday and evenings, nights, and weekends as needed. Minimal overnight travel (up to 10%) as required. This job description provides an overview of responsibilities and task to be performed. It is not intended to be an all-inclusive job description as needs tend to change over time.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
Associate degree
Number of Employees
251-500 employees