Part Time Highway

Allen County IndianaFort Wayne, IN
4d

About The Position

Under the direction of the ROW & Communications Manager, the Temporary Project Assistant is responsible for assisting with asset management and maintenance programs for Allen County’s bridge and roadway transportation systems. This position is not covered as defined by The Board of Commissioners of the County of Allen Employee Handbook.

Requirements

  • Enrolled and/or working towards a bachelor’s degree in construction, Civil Engineering or related field
  • Strong computer skills with the ability to use Microsoft Office Suite and other job-related software
  • Strong verbal and written communication skills
  • Ability to use job related equipment, including but not limited to traditional and global positioning system equipment, computer, printer, plotter, and scanner
  • Valid Driver’s License for driving to County job sites and operating County vehicles

Responsibilities

  • Assists with project plans.
  • Assists with the compilation and maintenance of construction record.
  • Assists with asset management of transportation infrastructure and related programs for roads, bridges, culverts, traffic control systems, drainage ways, pavement striping, pavement repair, trails, guardrail, and streetlights.
  • Assists with complaints and requests on issues related to roads, bridges, traffic, drainage, logjam removal, tree and brush control, and anti-graffiti activities.
  • Performs all other duties as assigned, including overtime as required.

Stand Out From the Crowd

Upload your resume and get instant feedback on how well it matches this job.

Upload and Match Resume

What This Job Offers

Job Type

Part-time

Career Level

Entry Level

Number of Employees

1,001-5,000 employees

© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service