We are a fusion power company based in Everett, WA, with the mission to build the world's first fusion power plant, enabling a future with unlimited clean electricity. Our vision is a world with clean, reliable, and affordable energy for everyone. Since Helion's founding in 2013, we have raised over $1 billion from long-time investors such as Sam Altman, Mithril, and Capricorn Investment Group as well as new investors SoftBank and Lightspeed to propel us forward. Our last prototype, Trenta, completed 10,000 high-power pulses and reached plasma temperatures of 100 million degrees Celsius (9 keV). We are now operating Polaris, our next prototype on the path to the world's first fusion power plant. This is a pivotal time to join Helion. You will tackle real-world challenges with a team that prizes urgency, rigor, ownership, and a commitment to delivering hard truths – values essential to achieving what no one has before. Together, we will change the future of energy, because the world can't wait. This position will help design, build, optimize and scale Helion’s high volume Capacitor Bank manufacturing Facility. The role will work cross functionally with Manufacturing, Design, Controls, Quality and Supply Chain to remove waste optimize layout and support a rapid production ramp. This role will report to our Factory Development Manager at our Everett, WA office.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior
Number of Employees
251-500 employees