We are a fusion power company based in Everett, WA, with the mission to build the world's first fusion power plant, enabling a future with unlimited clean electricity. Our vision is a world with clean, reliable, and affordable energy for everyone. Since Helion's founding in 2013, we have raised over $1 billion from long-time investors such as Sam Altman, Mithril, and Capricorn Investment Group as well as new investors SoftBank and Lightspeed to propel us forward. Our last prototype, Trenta, completed 10,000 high-power pulses and reached plasma temperatures of 100 million degrees Celsius (9 keV). We are now operating Polaris, our next prototype on the path to the world's first fusion power plant. This is a pivotal time to join Helion. You will tackle real-world challenges with a team that prizes urgency, rigor, ownership, and a commitment to delivering hard truths – values essential to achieving what no one has before. Together, we will change the future of energy, because the world can't wait. You will support the design, prototyping, and scaling of capacitors used for energy storage in Helion’s fusion generators. This role offers the opportunity to collaborate across technical teams to optimize complex electromechanical systems and accelerate Helion’s transition from rapid prototyping to generator mass manufacturing. Your work will directly contribute to delivering clean, reliable, low-cost electricity to the world. You will report to the Manager of Capacitor Design and this is an onsite role located at our Everett, WA office.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Number of Employees
251-500 employees