Working through the production orders in a timely manner as per the worklist provided by the MPR Controller Maintaining the available machine and personal capacities in line with the capacity demand and the current production situation Organizing tasks relating to material request, use of the correct material, order confirmations (good quantities, quantities requiring reworking and rejected quantities) and material consumption If required, planning the sequence within a specified safety period as part of the production order (basic dates) Responsible for checking and adjusting the stock levels within the production supply areas Responsible for creating all reports/KPIs for the Meeting Point within the shop floor management Participation on the flow of information regarding the technical availability of the machines as the interface between Production and MRP Instructing and training employees on all processes relating to Production Control
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Education Level
No Education Listed