As a Piping & Installation Helper at Dandelion Energy, you will support Ground Loop Commissioning (GLC) operations by installing and fusing HDPE piping, pressure testing, system flushing/filling, and preparing loops for commissioning. You will work directly under the Ground Loop Commissioning Lead on active job sites, receiving hands-on training in fusion, equipment operation, and geothermal ground loop installation. This is an outdoor, field-based role designed to build a technical foundation for a career in renewable energy construction, with no prior geothermal experience required.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
No Education Listed
Number of Employees
11-50 employees