Summary: The Material Planner I is responsible to assist in handling and maintaining the flow of material and products in manufacturing areas according to established guidelines; record movement of incoming and outgoing materials and supplies and help Supervisor verify the accuracy of work performed in the area. Also, will assist the Master Scheduler when necessary; provide daily shipment requirements to materials; and assist in setting and maintaining the weekly production schedule as required.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
High school or GED
Number of Employees
501-1,000 employees