Primarily works to ensure Gas Turbine Generator Package is ready to operate and conduct live run test. Preliminary checks include testing of instrument control systems for newly built and refurbished units. Assure units are fully calibrated and commissioned before being deployed for field operations.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED
Number of Employees
11-50 employees