Custom Countertop Installer - Crew Lead (2332)

CLASSIC ROCK FABRICATION LLCLower Paxton Township, PA
6d$22 - $28Onsite

About The Position

Responsible for the installation of custom flatworks in granite, quartz, marble, and other materials, ensuring adherence to company standards and safety protocols. Our goal is to ensure that working with our team is as exceptional as the products we create.

Requirements

  • Two to four years of related training in installation or construction.
  • Ability to read and comprehend simple instructions.
  • Ability to effectively present information in one-on-one and small group situations to customers, clients, and other employees of the organization.
  • Ability to add, subtract, multiply, and divide in all units of measure.
  • Ability to read and use a tape measure accurately.
  • Ability to apply common sense understanding to carry out instructions furnished in written, oral, or diagram form.
  • Ability to deal with problems involving several concrete variables in standardized situations.

Responsibilities

  • Enforce and follow all Classic Rock Fabrication (CRF) Safety Procedures and CRF Driving Policies.
  • Fit all horizontal and vertical seams to company standards.
  • Set tops as close as practical to the same plane as the cabinets, including cooktops.
  • Support tops every 4 to 6 inches at sink and cooktop fronts, as well as any gaps of 1/16” between the top and cabinet.
  • Use gorillas or clamps to pull seams to a maximum of 1/16” opening at the top.
  • Use color-matched adhesive in all seams when possible.
  • Understand how to add color to glue to enhance seam blending; recognize that Chameleon is not a fix-all for all colors.
  • Polish and blend the profiles of any seam to achieve a smooth, consistent finish, feathering out the polish to avoid dips.
  • Verify that all seams are checked for flatness with a razor blade before the seam is completely dry.
  • Support large (heavy) under-mount sinks with a wood frame and seal to the tops with a solid bead of silicone.
  • Support small (light) under-mount sinks with clips.
  • Ensure sinks include a “beauty” bead of silicone between the sink and stone after mounting to prevent water intrusion.
  • Caulk the top of the splash to the wall with paintable silicone when noted.
  • Caulk all vertical and horizontal joints of the splash; seams are to be set with Integra or knife-grade (2-part) glue.
  • Caulk tops to cabinets and walls at the end of the runs, applying a solid bead of silicone sealant where needed.
  • Ensure tops have a consistent overhang, except where cabinets do not allow.
  • Use drop cloths and vacuums when performing field cutouts inside to minimize dust and debris.
  • Conduct field cutouts at the end of the install.
  • Thoroughly clean and inspect the job site, both inside and outside, prior to leaving.
  • Submit Octane documentation before leaving the job site.
  • Submit supply requests to keep trucks stocked at all times.
  • Clearly mark and/or label all pieces returned to the shop.
  • Wear steel-toe boots at all times.
  • Wear a hard hat and fluorescent shirt/vest at all commercial sites.
  • Take pictures of the finished job site, including overall views, seams, sinks, and any potential issues.
  • Ability to cut, edge polish, create notches, cut outlets, and cut out blanks without damaging the final product.
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service