Construction Scheduler

BlackRock ResourcesChesterfield, VA
55dOnsite

About The Position

Are you an experienced Construction Scheduler who thrives on keeping large-scale projects moving seamlessly? This role offers the chance to make a measurable impact on a long-term EPC project - ensuring every milestone, from engineering to commissioning, stays on track. This position could be an excellent fit for a Project Manager looking to focus solely on scheduling responsibilities. If you're ready to bring your scheduling expertise to a long-term, high-impact project, let's connect! Qualified candidates may send their resumes directly to Brandon at [email protected]

Requirements

  • 5-6+ years of experience in construction scheduling for large industrial or infrastructure projects.
  • Hands-on proficiency in Primavera P6 (required).
  • Strong command of Excel, MS Project, and Word.
  • Experience with resource-loaded schedules, baseline schedules, time impact analyses, and earned value reporting.
  • Ability to read engineering and construction drawings and understand how projects are sequenced in the field.
  • Strong schedule analysis, troubleshooting, and forecasting skills.
  • Ability to convert schedules between Primavera P6 and Microsoft Project.

Responsibilities

  • Develop, implement, and analyze the master project schedule (engineering, procurement, construction, commissioning).
  • Integrate owner and contractor schedules into a unified master schedule.
  • Review critical path, constraints, and lag relationships to maintain project milestones.
  • Conduct detailed schedule variance analyses using Primavera P6.
  • Walk the project site weekly to verify contractor progress and document results.
  • Provide schedule data for change orders, bid comparisons, and issue resolution.
  • Prepare and deliver weekly/monthly progress reports and performance metrics to leadership teams.

Benefits

  • Per diem available (at GSA rate)
  • OT eligible

Stand Out From the Crowd

Upload your resume and get instant feedback on how well it matches this job.

Upload and Match Resume

What This Job Offers

Job Type

Full-time

Career Level

Mid Level

Industry

Mining (except Oil and Gas)

Education Level

No Education Listed

Number of Employees

51-100 employees

© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service