Construction Management (CM) Services: The primary project will replace the existing water distribution system with approximately 4,000 linear feet of 8-inch, 6-inch, 4-inch, 2-inch and ¾-inch HDPE water mains, service lines, master meter vault, and appurtenances serving the park’s historic Housing and Administrative offices and comfort station. Work includes soil borings to identify any karst voids in the project area, extensive rock trenching, hardscape replacement, and revegetation. In addition, project work also includes the following companion projects: a. Replacement and relocation of an existing comfort station lift station, integrated controls, 175 feet of electrical conduit, and approximately 330 feet of associated sewer lines plus manholes b. Replacement and relocation of a single 8-inch C900 water transmission main approximately 830 feet long, associated fittings, valves, and drain assembly. Period of Performance: Approx 420 calendar days of construction management services. Anticipate submittal initiation and contractor mobilization in the May 2026 timeframe. Exact dates of performance have yet to be determined and are dependent upon construction contract award and start of construction activities
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
No Education Listed
Number of Employees
11-50 employees