Invenergy is North America’s largest privately held developer, owner, and operator of power infrastructure. With 25 years of trusted execution, we deliver reliable, affordable energy through a diverse portfolio that includes natural gas, solar, land-based wind, energy storage, transmission, and domestic manufacturing. Headquartered in Chicago, we develop, own, and operate large scale projects that power communities and support the energy future. This position will be open for application for at least 3 calendar days from the posting date. This position will remain open for application based on business need, which may be before or after the 3-day posting window. Job Description About The Site The Spring Canyon Energy Center is a combined 120 MW wind generation facility located near Peetz, CO. The Spring Canyon Energy Center consists of Spring Canyon 1, which is a 60 MW wind power generation facility utilizing 40 GE 1.5 SLE turbine technology, and Spring Canyon II & III, which are a combined 60 MW wind power generation facility utilizing 35 GE 1.7/100 ESS wind turbine technology. Position Overview As a Wind Technician you will be responsible for operating and maintaining the Spring Canyon wind Energy Center.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
High school or GED