The Process Tech I is to remove and install molds, auxiliaries and EOAT (End‑of‑Arm Tooling) safely, efficiently, and repeatably, ensuring all utilities are connected, while maintaining accurate records so production can resume with minimal downtime. Schedule: 12-hour shift, Monday–Wednesday, 5:30 p.m.–6:00 a.m.; Thursday, 5:30 p.m.–10:00 p.m.; plus weekends as needed. Sub-Function Description: The Process Tech I is to remove and install molds, auxiliaries and EOAT (End‑of‑Arm Tooling) safely, efficiently, and repeatably, ensuring all utilities are connected; while maintaining accurate records so production can resume with minimal downtime.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
High school or GED
Number of Employees
1,001-5,000 employees