Savannah River Mission Completion (SRMC) is seeking a Salt Waste Processing Facility (SWPF) Senior Person In Charge (PIC) to be based in our Aiken, SC location on the Savannah River Site (SRS). The SWPF Senior Person In Charge (PIC) is the designated individual responsible for ensuring all aspects of a high risk or non-routine/complex work activity is conducted safely and according to defined scope and work package procedural requirements. This role implements all phases of Integrated Safety Management (i.e. Define scope of work, analyze the hazards, identify controls, perform work, and provide feedback) and maintains a controlling presence at the work site ensuring qualified personnel complete the appropriate technical work documents. Savannah River Mission Completion (SRMC), a prime contractor for the US Department of Energy, is responsible for managing the Department of Energy’s Savannah River Site’s Liquid Waste operations contract. Located in Aiken, South Carolina, SRMC is a limited liability company formed by nuclear operations and environmental remediation global leaders BWXT, Amentum, and Fluor. The SRMC Team is responsible for the closure of waste tanks, the operation of the Savannah River Site’s Defense Waste Processing Facility, tank farm operations and associated production and disposal facilities.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior
Education Level
High school or GED