QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects. Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients. Senior Scheduler Project Location: Eagle Mountain, UT (75% on Project Site, M-F). Ideally seeking candidates who reside in Utah or within close commuting distance. QISG has an immediate need for a Senior Scheduler to support a simple-cycle power generation project designed to power a data center. This is a construction-only project located in Eagle Mountain, Utah, and the selected candidate will be required to be on project site approximately 75% of the time, Monday - Friday. The project is a 286MW simple-cycle power generation facility with an approximate duration of 22 months and ~$250M in revenue. While prior simple-cycle power generation experience is highly preferred, it is not required. Strong utility, EPC, or heavy industrial construction cost control experience is required. Start Date: ASAP This is not a contract position — it is a full-time, permanent role with QISG. Upon completion of this project, the individual will transition directly onto another active project within the organization. At QISG, we design and build complex renewable infrastructure, with a strong focus on projects that power communities and strengthen the modern grid. QISG is seeking a Senior Scheduler to support a 286MW simple-cycle power generation project powering a data center. This construction-focused project requires the candidate to be onsite approximately 75% of the time. While prior simple-cycle power generation experience is preferred, it is not required. Strong EPC, utility, or heavy industrial construction scheduling experience is essential.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED