Electra is building the EL9 Ultra Short - a nine-passenger hybrid-electric aircraft that takes off and lands in 150 feet. By pairing blown-lift aerodynamics with distributed electric propulsion, the EL9 opens thousands of new access points - fields, parking lots, small airstrips - that conventional aviation can't touch. We call it Direct Aviation: getting people from where they are to where they want to go, without the airports, noise, or emissions. We've filed for FAA Part 23 type certification, hold 2,200+ pre-orders, and are backed by Lockheed Martin, Honeywell, and Safran. Bristow Group has secured the first EL9 delivery slot. First EL9 test flights are planned for 2027, with certification targeted for late 2029 to 2030. We're hiring a Director of Manufacturing Development and Production Planning to own how the EL9 gets built on time, on cost, and at rate. You'll build the production master schedule from first conforming articles through ramp-up, manage the program's recurring and non-recurring cost performance against plan, model the production learning curve, and own the S&OP cadence that ties customer demand to manufacturing capacity. You'll also set the line balance, takt time, and lead time targets that the manufacturing organization will execute against. This is a planning seat at a moment when there is no plan yet to inherit. You'll partner closely with the Director of Manufacturing Engineering on build plan and tooling readiness, with the VP of Industrialization & Manufacturing Strategy on capacity planning and the digital manufacturing backbone, with the VP of Supply Chain on material availability, and with Programs and Engineering on milestone integration.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Director
Number of Employees
11-50 employees