There are still lots of open positions. Let's find the one that's right for you.
The Installer III is responsible for assembling, installing and/or maintaining solar photovoltaic (PV) systems on varying surfaces (rooftop, ground mount, use specific structures, etc.). Daily activities are inclusive of, but not limited to, measuring, cutting, drilling, working from height, minor electrical work, assisting with structural upgrades, using hand/power tooling, reading plan-sets, following direction, following safe work practices, and assisting senior members of the designated installation team. This position is required to help mentor/train the Installer I and Installer II positions.