About The Position

Be part of a team that pushes boundaries, developing custom silicon solutions that power the future of Google's direct-to-consumer products. You'll contribute to the innovation behind products loved by millions worldwide. Your expertise will shape the next generation of hardware experiences, delivering unparalleled performance, efficiency, and integration. Google's Raxium display group has established a revolutionary semiconductor materials display technology that enables new functionality in display products, bringing to users a closer and more natural linkage between the digital and physical realms in applications such as augmented reality (AR) and light-field display. With start-up roots and a state-of-the-art compound semiconductor fab in Silicon Valley, Raxium is seeking to build upon its engineering team with an aim to disrupt next-generation display markets.

Requirements

  • Bachelor's degree in Industrial Engineering, Supply Chain Management, Operations Research, or a related quantitative field or equivalent practical experience
  • 10 years of experience in demand planning, supply planning, or operational planning within a semiconductor fab environment.
  • Experience in advanced demand forecasting methodologies, processes, material requirements planning (MRP), and production planning.
  • Experience in manufacturing execution system (MES) and fab reporting systems (e.g., FabTime).

Nice To Haves

  • Master's degree in Industrial Engineering or Supply Chain Management.
  • 12 years of experience in a compound semiconductor volume fab, with leading the supply planning process during a major production ramp.
  • Knowledge of architecting and implementing integrated planning ecosystems (encompassing people, process, and tools) from the ground up.
  • Understanding of compound semiconductor processing, cycle time drivers, and yield modeling.
  • Excellent data analysis and modeling skills (e.g., spreadsheet), with an ability to architect planning systems and dashboards from inception.

Responsibilities

  • Architect, document, and own the Fab's master production plan (MPP), integrating customer demand, capacity constraints, cycle time models, and material availability.
  • Translate the master production plan into the single source of weekly and daily Lot start targets, serving as the primary pull signal that dictates material flow and WIP management for all fab operations.
  • Establish, own, and enforce the official Fab planning factors, including validated capacity models, cycle time (CT) models, and yield models, ensuring planning is based on current, measured operational data.
  • Lead the partnership with systems/software to design, build, and deploy scalable planning tools, defining data architecture and maintaining central dashboards.

Stand Out From the Crowd

Upload your resume and get instant feedback on how well it matches this job.

Upload and Match Resume

What This Job Offers

Job Type

Full-time

Career Level

Senior

Number of Employees

5,001-10,000 employees

© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service