Senior Scheduler

Luster NationalOakland, CA
22hHybrid

About The Position

We’re seeking a Senior Project Scheduler to support large, heavy-civil infrastructure projects in highways, roads, and bridges, transit (bus and rail), aviation (international airports), and water sectors delivered through both traditional and alternative methods. You’ll craft logic-driven CPM schedules, fold in procurement and third-party dependencies, and convert field data into clear progress updates and forecasts. By surfacing critical-path risks early, shaping recovery strategies, and keeping stakeholders aligned, you’ll help every project advance safely, efficiently, and on time. This is a long-term, full-time, hybrid (3 days/wk on-site) position located in Oakland, CA.

Requirements

  • Bachelor’s degree in engineering, construction management, or related field, or equivalent combination of education and experience.
  • 10+ years of hands-on scheduling experience for large (>$500M), complex, heavy-civil infrastructure projects.
  • Experience working on projects delivered through traditional and alternative methods (e.g., DBB, DB, CM/GC, and P3).
  • Experience with full CPM baseline schedule development, resource or cost loading, and progress updating.
  • Experience with Earned Value Management (EVM), resource planning, and cashflow management.
  • Experience applying risk analysis techniques to CPM schedules, including identification of schedule threats and mitigation strategies (e.g., Monte Carlo analysis).
  • Experience conducting forensic CPM scheduling to analyze and resolve project delay claims.
  • Experience creating and presenting technical presentations in group settings and meetings.
  • Proficiency with risk software (e.g. Primavera Risk, @Risk, etc.).
  • Proficiency with forensic scheduling software (e.g., Acumen Fuse, Schedule Cracker, Project Analyzer, etc.).
  • Proficiency with industry standard project and construction management software (e.g., Primavera P6, TILOS, MS Project, Bluebeam, RSMeans, etc.).
  • Proficiency with Microsoft Office Suite/Office 365 (e.g., Outlook, Word, Excel, PowerPoint, Teams, etc.).
  • Excellent written and verbal communication and interpersonal skills.
  • Excellent multi-tasking and organizational skills.
  • Collaborative mindset that fosters teamwork, trust, and positive relationships.
  • Natural curiosity, problem-solving abilities, and a passion for continuous improvement.

Nice To Haves

  • Master’s degree in engineering or construction management.
  • Active professional certifications such as PSP (AACE), PMI-SP or PMP (PMI), and/or CCM (CMAA).
  • Experience with large projects in the following sectors: highways, roads, bridges, transit (including rail and bus), airports, and/or water.
  • Proficiency with Power BI, Tableau, or similar platforms for building interactive dashboards and KPI visualizations.

Responsibilities

  • Build and maintain an integrated CPM schedule that covers design through turnover, with logically linked activities, resource or cost loading, and clear coding for cost-control alignment.
  • Collect field progress data, update status weekly or monthly, and produce look-aheads, variance reports, and earned-value forecasts.
  • Run critical path and what-if analyses to test sequencing options, recovery plans, and alternative delivery scenarios.
  • Perform schedule-risk assessments—identify drivers, quantify exposure with tools such as Monte Carlo simulations, recommend contingencies, and track mitigation actions.
  • Support change orders and claims by preparing Time Impact Analyses that tie delays to cost and contractual entitlement.
  • Integrate third-party interfaces, permitting, utility relocations, and long-lead procurement items, so the plan reflects all external dependencies.
  • Generate concise narrative reports, Gantt charts, S-curves, and KPI dashboards for project managers, field teams, and executive stakeholders.
  • Enforce schedule governance standards, maintain data integrity in scheduling tools, and mentor junior schedulers to raise overall planning maturity.
  • Support PMIS Integrated Services which may include learning of new systems, tools, and technology.
  • Utilize tools for scheduling like Primavera P6, MS Project, and Oracle Primavera Cloud Schedule.
  • Support Cost Analytics when needed as relates to Client Enterprise Portfolio delivery and additional software tools.

Benefits

  • Unlimited Flexible Time Off
  • Paid Holidays
  • Paid Parental Leave
  • Health Insurance
  • Dental Insurance
  • Vision Insurance
  • Flexible Spending Accounts (Healthcare and Dependent/Elder Care)
  • Long Term Disability Insurance
  • Short Term Disability Insurance
  • Life Insurance and Accidental Death & Dismemberment Policy
  • 401(k) Plan with Guaranteed Employer Contribution
  • Formal Career Planning and Development Program
  • $2,500 Annually Towards Professional Development
  • Wellness Program with Monthly Wellness Stipend
  • Company Cell Phone or Cell Phone Plan Reimbursement
  • Free Personalized Meal Planning & Nutrition Support With a Registered Dietitian
  • Free Personal Financial Planning Services
  • Employee Assistance Program
  • Employee Discounts
  • Employee Referral Bonus
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service