Turner & Townsend-posted 3 months ago
Full-time • Senior
Rayville, LA
Professional, Scientific, and Technical Services

Turner & Townsend is seeking an experienced Senior Scheduler to join our data center team for a major construction project onsite in Rayville, Louisiana. This position requires onsite presence Monday-Friday in Rayville, LA. Local candidates or those open to relocation are preferred, but a per diem is available for those unable to relocate. The ideal candidate will have experience developing and managing construction schedules for mission-critical facilities, strong knowledge of scheduling best practices and project controls, and excellent communication skills for working closely with stakeholders in a client-facing role.

  • Regular travel to construction site is expected.
  • Effectively work with Stakeholders, Clients, Contractors and Subcontractors on a daily basis.
  • Develop and maintain detailed 'end to end' construction program schedules using Primavera P6 and Tableau for multi-project/programmatic environments.
  • Ensure that schedule related data from vendors, suppliers, engineering and construction contractors of actual projects is provided as feedback into the planning and scheduling systems.
  • Implement Project Planning & Scheduling strategy, plans and procedures, reflecting both Company and contractor roles, responsibilities and expectations.
  • Actively work with project managers, construction firms and subcontractor firms as necessary to maintain schedule integrity.
  • Provide interface and quality assurance to Project functional groups and contractors regarding the tracking and reporting of schedule performance.
  • Ability to coordinate & organize multiple sources of schedule inputs/performance data into a master schedule platform and deliver project/program status reports as required.
  • Prepare and update progress reports as required by the client, including the Integrated Planning/Scheduling contribution to the monthly project report and specific reports/presentations.
  • Produce high level and 1, 3, 6 month look ahead from P6 for reporting.
  • Perform probabilistic/trend analysis on integrated schedules and contractor schedules.
  • Actively monitor and communicate any possible project issues that could delay the schedule.
  • Conduct the required project schedule analysis, critical path analysis and schedule risk analysis for the project and wholistic program.
  • Analyze deviations from the baseline in the Project Master schedule highlighting bottlenecks/delays and propose corrective actions, and highlight the overall schedule impact of any variance/change order.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
  • Experience working in mission critical environments is preferred including commissioning activities.
  • Understanding of MEP systems.
  • Understanding of best practice relating to the delivery of a construction program is required.
  • Extensive experience creating and managing large-scale construction schedules in Primavera P6.
  • A background in Project Controls is beneficial.
  • Familiarity with construction drawings, specifications and construction sequencing is required.
  • Being able to work independently is crucial.
  • Capable of producing detailed concept level schedules from limited project information.
  • Identifying major phases through that timeline and be able to determine and discuss dependencies.
  • Working closely with various disciplines in project teams to ensure the accuracy and completeness of the schedules produced without compromising your independence as a scheduler.
  • Knowledge of system start-up sequences and major dependencies.
  • Able to convert data into Tableau reports and graphics.
  • Excellent collaboration and communication skills are required.
  • BS Degree in Engineering or Business or related field; or demonstrated equivalent and related experience.
  • PSP certification by AACE in planning/scheduling is beneficial.
  • EIT certification Preferred.
  • Promote a healthy, productive and flexible working environment that respects work-life balance.
  • Equal opportunity employer.
  • Celebrate diversity and are committed to creating an inclusive environment for all employees.
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service