The Scheduler II is responsible for developing and maintaining detailed production schedules that ensure alignment between customer demand, manufacturing capacity, material availability, and inventory objectives. This role plays a critical part in coordinating planning activities across Supply Chain, Operations, Procurement, and Customer Service to achieve efficient, cost-effective production flow and on-time delivery performance. The Scheduler II utilizes analytical tools and ERP systems to manage short- and medium-term production schedules, monitor resource utilization, and adjust plans based on changing priorities. This position supports continuous improvement initiatives focused on enhancing scheduling accuracy, minimizing downtime, and optimizing material and labor utilization — in line with Plaskolite’s “One Plaskolite” culture of collaboration, integrity, and operational excellence. This position requires attention to detail, the ability to work in a fast-paced manufacturing environment, and a strong commitment to safety, teamwork, and quality—reflecting Plaskolite’s core values of Integrity and Improvement.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Number of Employees
501-1,000 employees