QSP (Qualified SWPPP Practitioner) and QSD (Qualified SWPPP Developer)

Emerald Site ServicesSanta Clarita, CA
9d$71,000 - $95,000

About The Position

Emerald Site Services, Northern California's premier stormwater, erosion, and dust control contractor, is bringing their wide range and industry leading scope of services to the Southern California market. QSP and QSD are certifications required under California's Construction General Permit (CGP) , administered by the State Water Resources Control Board. These roles ensure compliance with stormwater regulations to prevent pollution from construction sites through the development and implementation of a Stormwater Pollution Prevention Plan (SWPPP). These positions are particularly relevant for construction projects disturbing soil (typically 1 acre or more) in California, where a certified QSD prepares the SWPPP, and a QSP oversees its on-site execution. Qualified SWPPP Developer (QSD) Role: Planner, Designer & Certifier Develops and certifies the Stormwater Pollution Prevention Plan (SWPPP) to meet 2022 CGP standards, including TMDL compliance and post-construction requirements. Qualified SWPPP Practitioner (QSP): Role: On-Site Implementer & Compliance Manager Leads daily field execution, inspections, sampling, and BMP maintenance during construction.

Requirements

  • Approved prerequisite (e.g., CA PE, PG, CESSWI, or equivalent).
  • Complete CASQA-approved training, exams, and 2022 CGP Reissuance Review.
  • 6 hours annual continuing education; biennial renewal.
  • Approved prerequisite (e.g., relevant certifications/education).
  • Complete CASQA-approved training, exams, and 2022 CGP Reissuance Review.
  • 6 hours annual continuing education; biennial renewal.

Responsibilities

  • Prepare, certify, and amend the SWPPP (site maps, risk assessments, pollutant source evaluation, BMP selection, monitoring plans).
  • Conduct site-specific TMDL assessments (e.g., RUSLE2 modeling for sediment) and select advanced BMPs/treatment systems.
  • Ensure compliance with effluent limits, Numeric Action Levels (NALs), post-construction run-off, and dewatering rules.
  • Perform required inspections (e.g., startup, biannual seasonal, post-NAL exceedance).
  • Collaborate with owners/engineers/contractors to integrate SWPPP into project design/permits.
  • Submit/amend documents via SMARTS (NOI, risk assessment, SWPPP uploads).
  • Oversee implementation and support corrective actions/amendments.
  • Conduct visual inspections required by QSD (Initial 30 Day, Semi-Annual, Inactive).
  • Install, inspect, maintain, and repair BMPs (erosion/sediment controls, stabilized entrances, etc.) to BAT/BCT standards.
  • Conduct frequent visual inspections (monthly, pre/during/post-qualifying rain events, post-NAL exceedance).
  • Perform stormwater/non-stormwater observations, effluent sampling (pH/turbidity for higher-risk sites), non-visible pollutant checks, and receiving water monitoring when triggered.
  • Identify/correct deficiencies, implement fixes for exceedances, and recommend SWPPP amendments.
  • Train site personnel and delegates on SWPPP/BMPs/TMDL requirements.
  • Update SMARTS with inspection logs, sampling data, and Annual Reports.
  • Delegate tasks to trained QSP Delegates (with foundational/site-specific training and oversight).
  • Verify compliance for inactive/stabilized sites and support project closeout.
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service