Project will design, build, and commission a new 0.1 mile lateral pipeline, aerial pipe bridge, metering station, and interconnect facilities to enable the delivery of third party gas to a new Gulf Coast LNG facility now in construction. The project is currently moving into the EPC phase with startup scheduled for 3Q27. Successful candidate will join the Owner's Project Management Team and function as the Owner's Structural Engineering representative during design, fabrication, construction and commissioning. Work location will be at a Houston based EPC, with frequent trips to the site in Sabine Pass, TX. and to the Owner's offices in Houston and Beaumont, TX. Job Summary: Act as Owner's Engineer in the management of engineering, design and all structural related technical aspects for a new natural gas pipeline, the pipe bridge, structural components for a Pressure Control Skid, and various platforms. Provide technical leadership and to all operational, regulatory and project driven activities including structural design for gas pipeline design and construction.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Career Level
Mid Level
Industry
Administrative and Support Services
Number of Employees
101-250 employees