About The Position

This position sits within the Power Generation Division which is responsible for all NextEra Energy's non-nuclear generation operations. This is a multi-craft position that operates and maintains plant equipment. The plant is located in Pensacola, Florida. Preferred craft Instrumentation and Controls.

© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service