Production Tech II - Gulf Clean Energy Center

NextEra EnergyPensacola, FL
240d

This job is no longer available

There are still lots of open positions. Let's find the one that's right for you.

About The Position

This position sits within the Power Generation Division which is responsible for all NextEra Energy's non-nuclear generation operations. This is a multi-craft position that operates and maintains plant equipment. The plant is located in Pensacola, Florida. Preferred craft Electrical or I&C.

© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service