Wash/Dry

Crown Laundry SvcAustell, GA
2hOnsite

About The Position

The primary purpose of the production operator is to rotate through various positions within the plant to facilitate production by means of operating production equipment. Equipment must be operated in such a manner as to meet and exceed our customer expectations daily in the safest possible manner. Employees are required to learn all equipment and rotate as needed. Typical learning curve for each position is no longer than 2-5 working days. Standards must be met for each position (2) within two weeks of hire and sustained during employment. Extremely Warm Environment. Normal work week is 40 hours, with a possible mandatory two hours of overtime. Overtime requirements will be posted daily. Production stops when orders are completed. There may be adjustments to schedule as required. Schedules are assigned on a rotating basis, with days off built into the schedule assigned to each employee.

Requirements

  • The ability to perform the essential functions of the job, with or without an accommodation.

Nice To Haves

  • High School Education or GED preferred
  • Basic computer

Responsibilities

  • Will secure linen carts, will learn how to stack, and build carts proficiently per our standards in a manner that’s conducive to our customer standards.
  • Remove linens from the Folder machine, count and stack them per stacking standards, and push the full baskets to the next staging area.
  • Secure a linen cart. The incumbent will have to push, pull and put the cart into place.
  • Remove items from the conveyor, normally catching items from up to six stations.
  • If an item is caught or hung up in the machine, they must contact maintenance. Only maintenance or production managers can pull jams.
  • The catcher may take empty cart over to the dryer area, grab another cart and bring it back to their work area.
  • Adhere to quality standards in terms of quantity and quality of stacking.
  • Perform other duties as assigned.
  • Remove product from the previous process. Identify through previous job knowledge how many items per stack.
  • Pull cart over to work area, adjusting the cart so that linen is at a comfortable waist level.
  • Fold items and place on the countertop.
  • For larger items, there may be group folding. Each folding partner grabs the lengthwise end of the item. The partners step back and make a lengthwise fold in the item. One person places it on the countertop, in stacks of five.
  • Fill up the cart in a like manner.
  • Take the cart over to the next work area.
  • Adhere to all quality standards,
  • Adhere to all safety standards.
  • Perform other duties as requested.
  • Attach a copy of the order form to the side of the cart
  • Maintain track during the day of which orders have been filled and which haven’t
  • Repeatedly walk through the plant and proactively seek out finished carts.
  • Roll the carts to the weighing area
  • Pull the cart up onto the floor scale
  • Record the weight into the software program
  • Pull the weighed cart off the scale
  • Push the next cart onto the scale and repeat the process
  • Enter the proper information into the Shipping Software
  • May load the delivery truck by pushing the weighed carts onto the back of the appropriate truck as required.
  • May fill in for other positions as required, i.e., production operator/builder
  • Any other duties as required.
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service