A Power Plant CT Operator-Apprentice position is available with the Southern Gas Turbine generation department, reporting to Hagood Generating Station located in Charleston, South Carolina. The Southern Gas Turbine Generating group consists of three simple cycle gas turbine generators with a combined total generation of 140 megawatts, as well as a 50-megawatt Combustion Turbine that is located at Bushy Park in Goose Creek, South Carolina. This position is responsible for: Troubleshooting electrical, electronic, instrumentation, control, switchgear, exciter, and mechanical problems related to simple cycle combustion turbine-generator units Performs I&C and mechanical maintenance on plant equipment and systems Operates all plant equipment Performs other manual or administrative work as assigned. Pay for this position ranges from $31.91 to $42.83 per hour based on experience.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Industry
Utilities
Education Level
High school or GED
Number of Employees
5,001-10,000 employees