Planning Co-op at SACB

Boston Beer CompanyCincinnati, OH
2h$18 - $20Onsite

About The Position

We are currently hiring a Planning Co-op at our Cincinnati Brewery. This is a 6-month Co-op running from July 2026 - Dec. 2026. Working in our Cincinnati Brewery, the co-op will support projects that are focused on improving workflow, uniformity of process, and adaptability of current/future tooling. The co-op will use their engineering background along with strategy to help analyze problems, support determining solutions and monitor the results.

Requirements

  • Must be pursuing a bachelor’s degree in engineering, supply chain, operations planning, or business and engineering.
  • Strong communication, interpersonal, and teambuilding skills.
  • Self-starter, proactive.
  • Proven problem solving/conflict resolution skills; be able to think through issues and arrive at well-thought conclusions.
  • Able to impact and effect positive change with a flexible, open-minded, positive approach.
  • Demonstrated ability to be successful in a collaborative team environment.
  • Competent in using Microsoft Office, including MS Word, MS Excel, MS PowerPoint.
  • Ability to lift up to 60 lbs repetitively throughout the shift.
  • Must be flexible to occasionally work off- shifts (evenings, early mornings).
  • While performing the duties of this job, the employee will be required to walk, stand, sit, kneel and crouch.
  • Tolerate summer/winter temperature conditions and hot and cold in production environment.
  • Must not require sponsorship to work in the United States, now or in the future

Nice To Haves

  • Experience in high-speed manufacturing environment a plus.
  • Previous co-op experience within an industrial environment a plus

Responsibilities

  • Assist in the execution of foundational planning changeover matrix through cross departmental development to assist repeatability of our planning processes.
  • Analyze current losses in regards to ingredient and material planning & perform formalized problem solving to identify the root cause. Recommend/implement countermeasures from findings.
  • Support experiments that lead to our next improvement around planning efficiencies.
  • Work on special projects around implementation of MRP, EWM, and Kinaxis programs.
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service