The Piledriver is responsible for the installation of footing piles and earth support sheeting systems as directed by the Foreman or Superintendent. The Piledriver works with pile driving rigs that drive metal, concrete or wood piling into the earth during the early stages of construction. Piledrivers work with a variety of hand and portable power tools, and frequently cut, join, and fasten metal construction materials using welding equipment and oxy-acetylene torches. Direct/Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials. Load, unload, or identify building materials, machinery, or tools, distributing them to the appropriate locations, according to project plans or specifications. Drilling and setting of pile with use of caisson or other type drill rig. Lubricate, clean, or repair machinery, equipment, or tooling as needed. Welding of Connections (safety railing, tiebacks, internal bracing, etc.). Shooting Grades and/or layout of work. Installation of pile with either a diesel hammer and/or a vibratory hammer. Makes small repairs to diesel hammers as needed. Testing of micro pile/tie backs and load frames. Shares knowledge by mentoring junior team members. Assists other craft workers as needed. Keep project superintendent or general superintendent informed of known actions, written or verbal, which may affect the ability to successfully perform tasks at construction project sites or adversely affect company operations.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED