AST SpaceMobile is building the first and only global cellular broadband network in space to operate directly with standard, unmodified mobile devices based on our extensive IP and patent portfolio and designed for both commercial and government applications. Our engineers and space scientists are on a mission to eliminate the connectivity gaps faced by today’s five billion mobile subscribers and finally bring broadband to the billions who remain unconnected. Position Overview The Multi-Layer Insulation (MLI) Installation Manager is responsible for leading the installation and quality execution of thermal insulation systems critical to spacecraft performance. This role oversees a team of technicians and ensures all MLI installations meet stringent thermal, cleanliness, and contamination control requirements. The MLI Installation Manager partners closely with engineering, manufacturing, and program management to deliver high-quality hardware on schedule. This position plays a key role in bridging design intent with hands-on execution in a fast-paced aerospace production environment.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Manager
Number of Employees
1-10 employees