Responsible for setting plastic injection molds to run consistent quality parts per the production standard and within the process parameter tolerances established on the process sheet. Must be able to correctly hook up all necessary water lines, ensure properly water flow, and set the thermolator temperatures as outlined on the process sheet. Must be able to clean, load new material, and set drying parameters on hopper/dryers. Must be able to troubleshoot, and make appropriate process adjustments to resolve injection molding cosmetic or performance issues. Must be able to safely and proficiently operate all necessary equipment: hot runner controllers, chain hoist, fork lift, stand-up lift, scales, press monitoring system, and parts-picking robots. The employee must complete all necessary lot control and tracking paperwork as required, and notify the Crew Leader/Lead Person when a mold is ready to start normal production.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
High school or GED
Number of Employees
251-500 employees