The Walsh-VINCI Transit Community Partners (WVTCP) Joint Venture consisting of VINCI Construction Grands Projets and Walsh Construction has been selected to construct the $2.9BN Design Build Red Line Extension (RLE) project – the largest civil construction contract ever awarded by the Chicago Transit Authority (CTA). The RLE Mainline Design-Build (MDB) Project will extend the CTA's Red Line by 5.6 miles, extending from the existing terminal at 95th/Dan Ryan south to 130th Street and Doty Avenue. As the Materials Coordination Lead on the $2.9BN Red Line Extension Project (RLE) in Chicago-Illinois, you will be responsible to schedule, review, track, and coordinate the material documentation, including test reports, to demonstrate project conformance with the Contractor’s Quality Management System and Contract requirements relating to permanent materials and materials put into place for temporary use by the CTA.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
No Education Listed