Performs the Make, Buy and / or Bill of Material (BOM) planning activities associated with Manufacturing Resource Planning (MRP) transactions. Performs one or more multiple manufacturing activities within various manufacturing functions. Maintains production systems integrity to drive inventory optimization to minimize cost. Expedites and optimizes material flow through the supply chain to meet customer requirements. Coordinates with manufacturing and Operations Management to provide shop floor control on make parts, analyzes and controls production schedule and capacity requirements, executes the plan, provides timely status and expedites or works around plans to preserve schedule. Coordinates with Supply Chain Stakeholders including Procurement and Operations Management to determine appropriate time phased plan for procured parts and executes processes to ensure deliverables meet production schedule requirements. Maintains MRP parameters including lead times and lot sizes and coordinates with Engineering and Change Board Rep to make the associated changes to the BOM. What’s In It For You From onsite to remote, we offer flexible work schedules to comprehensive benefits investing in your future and security, Learn more about Lockheed Martin’s comprehensive benefits package here. Do you want to be part of a company culture that empowers employees to think big, lead with a growth mindset, and make the impossible a reality? We provide the resources and give you the flexibility to enable inspiration and focus -if you have the passion and courage to dream big, work hard, and have fun doing what you love then we want to build a better tomorrow with you. Fort Worth, TX This position is in Fort Worth, TX Discover Fort Worth.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Number of Employees
5,001-10,000 employees