Line & Grade Instrument Man II (Project Based)

Baker Concrete ConstructionBay Minette, AL
5d

About The Position

The Line & Grade Instrument Man II provides the expertise and coordination in using the surveying equipment to ensure that the work is laid out in the most effective and accurate way possible. Coordinates layout activities with the Party Chief, Superintendent and/or Foremen for the installation of layout on a project. Has a good understanding of our SQP goals and collaborates with project leadership to identify improvement ideas. Contributes to effective project management through daily observations andmunication. Supports the field in resolving any conflicts with tolerances and field constructability issues in the installation of the work. Contributes to safety on the project by perpetuating the IIF culture.

Requirements

  • High School Diploma and 4 years' construction experience; or equivalentbination of education and experience
  • Must have AutoCAD experience
  • Must have 2 years' experience as an Line & Grade Instrument Man I
  • Ability to respond tomon inquiries orplaints from customers and regulatory agencies
  • Good listening skills
  • Ability to work within a team environment
  • Ability to calculate figures and amounts such as proportions, percentages, area, circumference and volume; understanding of geometry and trigonometry
  • Knowledge of industry tolerances
  • Working knowledge in the use of the coordinate system
  • Ability to work harmoniously, respectfully and effectively with subordinates, peers, supervisors and clients
  • Team player, who provides information to the workforce, resolves conflict, and provides feedback
  • Ability to direct work

Responsibilities

  • Responsible for accurately maintaining all physical site dimensions and controls
  • Responsible for accurate layout of building location, structures, and dimensions throughout the project
  • Assists in establishing procedures and coordinating with the client to define primary survey points and transfer building control on the site
  • Establishes secondary control andmunicates procedures to individual work crews
  • Implements procedures to adequately provide layout methods and check/re-check
  • Provides required data to Party Chief to establish defining points needed in a data collector
  • Calculates and monitors concrete hold quantities on a daily basis
  • Developing plan views that accurately reflect installed conditions
  • Maintainsmunication with Party Chief, Superintendent, Foremen and other trades to coordinate project layout
  • May serve as the Party Chief on smaller projects
  • Sets up and checks accuracy of surveying equipment through pegging and double centering, or other methods
  • Validates calculations and other information provided by the Party Chief/Superintendent
  • Reviews construction documents for accuracy, deviations, and conflicts and writes clarification requests accordingly
  • Collaborates with Party Chief, Superintendent, Foremen and other trades to resolve constructability conflicts
  • Interfaces with Formwork Engineering department to provide layout for formwork shop drawings
  • Maintains field notes and documentation generated by layout
  • Reviews and understands construction drawings and identifies discrepancies
  • Responsible formunication of changes and maintenance of technical drawings, as-builts, clarification logs, etc.
  • Knows and applies general construction tolerances in the application of work including the determination of the most stringent tolerance and its use
  • Sets example by following safety guidelines including but not limited to wearing PPE on jobs, staying aware of surroundings, etc.
  • Attends and participates in Tool Box Talks and provides input for Safety Task Analysis
  • Complies with proper safety procedures

Stand Out From the Crowd

Upload your resume and get instant feedback on how well it matches this job.

Upload and Match Resume

What This Job Offers

Job Type

Full-time

Career Level

Mid Level

Education Level

High school or GED

Number of Employees

5,001-10,000 employees

© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service