Intern Construction Scheduler Summer 2026 - ID

Hoffman Construction CompanyBoise, ID
54dOnsite

About The Position

Position Summary: The Construction Scheduler Intern will work within the Scheduling Department and will report to the Scheduling Manager. They may assist the Project Managers and Project Superintendents to input schedule status updates, incorporate logic changes and delays, and analyze project schedule progress, and other duties as assigned. This position will be fully in-office and will include the use of multiple software programs.

Requirements

  • Experience with project management software such as Primavera Project Planner (P6), Procore, Bluebeam, and Microsoft Project.
  • Experience in Windows and Microsoft Office 365 (Excel, Word, Outlook, Power Point and Teams), and have a general understanding of working within a computer network.
  • Experience with design software such as AutoCAD, Revit and Navisworks.
  • Training in design and construction document reading, design specifications, survey theory and techniques.
  • Experience in organizing technical data in a neat and accurate method.
  • Familiar with CSI specification system for construction.
  • Highly developed visual observation and interpretation skills.
  • Ability to work well and maintain a cooperative attitude through high-pressure situations.
  • Excellent time-management skills and ability to multi-task and prioritize work while frequently interrupted by phone calls and questions on work in progress.
  • Excellent written and oral communication skills with an ability to develop strong interpersonal relationships.
  • Patience and professionalism are essential.
  • Must be a strong team player with the ability to collaborate with various personnel within and across departments and at all levels of leadership.
  • High School Diploma or GED required.
  • Pursuing a bachelor’s degree in Civil Engineering, Mechanical Engineering, Electrical Engineering, Construction Management, Architecture, or equivalent degree/certification and/or equivalent related work experience in data management required.
  • Educational background in materials and methods of construction.

Nice To Haves

  • Some scheduling experience with Primavera software (P6) is preferred.

Responsibilities

  • Collect and input schedule status update information into the record project schedule.
  • Attend in-person and/or virtual project schedule progress meetings as needed.
  • Identify changes to the project schedule.
  • Notify teams of impacts to critical path activities and/or schedule logic.
  • Ensure technical schedule integrity is maintained.
  • Produce and distribute weekly and monthly schedules, forecasts, and reports.
  • Manage Outlook distribution lists and standard form emails for schedule distribution.
  • Maintain project schedule archives and documentation.
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service