Installation & Planning Manager

Alterman, Inc.Grapevine, TX
23h

About The Position

The Installation and Planning Manager is responsible for overseeing a team of Project Designers and Installation and Planning Specialists and ensuring compliance with the PACK (Packaged Alterman Construction Kit) process for an assigned division. The Installation & Planning Manager works closely with preconstruction, project support, and manufacturing to reduce material costs, provide labor effective solutions, and improve overall processes.

Requirements

  • Bachelor’s degree from an accredited university or 6 years of construction experience in scheduling, project management or other operational roles required.
  • Prior experience as an Installation and Planning Specialist required.
  • Excellent verbal and written communication skills.
  • Excellent interpersonal skills.
  • Excellent organizational skills.
  • Advanced analytical and problem-solving skills.
  • Proficient with Microsoft Office Suite and Bluebeam. Proficiency with Microsoft Power Platform Software Suite preferred. Able to learn and use related software and systems as required.
  • Able to read drawings, specifications, and submittals.
  • Able to demonstrate an in-depth understanding of installation means and methods used in the electrical construction industry, with an emphasis on front end design produced prefabrication and pre-assembly of electrical products and assemblies. Must have a firm understanding of the order and durations for electrical installation.
  • Able to demonstrate a strong understanding of construction methods across multiple trade disciplines, preferably in concrete forming and placement, steel erection, mechanical, and framing.
  • Able to demonstrate and maintain a strong knowledge of procurement and logistics.
  • Able to prioritize and manage multiple tasks in a high production environment while adhering to tight timelines/deadlines.
  • Able to collaborate and effectively communicate with internal and external customers and vendors.

Responsibilities

  • Assigns, oversees, and reviews the work of assigned Project Designers.
  • In coordination with the Installation & Planning Manager, handles staffing decisions for assigned Project Designers, including, selection, performance appraisals, etc.
  • Coordinates with Project Designers, BIM Technicians, Project Managers, and field personnel to ensure resources are allocated appropriately.
  • Schedules workforce, sets requirements, and evaluates ability of personnel.
  • Plans, schedules, and coordinates the flow of products through the complete manufacturing process.
  • Implements, maintains, and evaluates means of quality control in design and manufacturing.
  • Ensures that all company safety policies are being adhered to.
  • Ensures that all schedules and completion dates are met efficiently.
  • Continually evaluates best work practices for field installation.
  • Evaluates projects for the impact of providing design and Packaged Alterman Construction Kits (PACKs).
  • Collaborates with Project Managers to develop installation timelines, resources, and budgets.
  • Reviews installation plans and specifications to ensure compliance with PACK requirements.
  • Ensures operational alignment with PACK, optimizing improvements in processes and procedures.
  • Interfaces with Purchasing and Logistics to ensure schedules are achieved.
  • Updates and advises the Virtual Design & Construction (VDC) Manager regarding status and any issues that affect the operations of assigned projects.
  • Advises the Virtual Design & Construction (VDC) Manager on potential upcoming projects regarding projected workforce requirements.
  • Performs other duties as assigned.
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service