Estimator (Data Center Construction)

Black BoxPlano, TX
49dRemote

About The Position

The Estimator – Data Center Operations supports the preparation, analysis, and development of project cost estimates for data center infrastructure projects. This role is ideal for detail-oriented professionals with a technical mindset who want to grow within data center construction, structured cabling, and mission-critical operations. The Estimator will work closely with project managers, engineers, procurement teams, and vendors to ensure accurate and competitive estimates that support successful project delivery and profitability. Position Details: Exempt Salaried position based upon experience; weekly salary broken down hourly for invoicing purposes only. Contract with possible contract extension or hire Standard work hours: Must be flexible, varies upon project demands Location: Remote - near Plano, TX Travel - up to 15% (mainly to Plano HQ)

Requirements

  • Associate or Bachelor’s degree in Construction Management, Engineering, or a related technical field .
  • 3-5 years in estimating, project coordination, or data center construction (internships or field experience acceptable).
  • Knowledge of Division 27 construction specifications in ISP environments
  • Strong understanding of electrical, mechanical, or cabling systems used in mission-critical facilities.
  • Proficiency in Microsoft Excel , Bluebeam , and estimating software (e.g. Trimble , Accubid , or PlanSwift ).
  • Ability to read and interpret technical drawings and specifications .
  • Strong numerical accuracy , analytical thinking, and attention to detail.
  • Excellent communication and teamwork skills.

Nice To Haves

  • Familiarity with BICSI standards , data center design concepts , or structured cabling .
  • Exposure to vendor bid comparisons , RFP processes , or cost control systems .
  • Basic knowledge of AutoCAD , Revit , or construction scheduling software .
  • Experience working in a fast-paced environment with tight deadlines and multiple stakeholders.

Responsibilities

  • Assist in preparing cost estimates , bills of materials (BOMs) , and labor projections for data center construction and infrastructure projects.
  • Interpret blueprints, specifications, and scope documents to determine project requirements.
  • Collaborate with project engineers, field operations, and procurement to validate material quantities, labor rates, and vendor quotes.
  • Perform take-offs for structured cabling, electrical, and mechanical systems related to data centers.
  • Support bid preparation and submission for RFPs and client proposals.
  • Update and maintain historical cost data , unit pricing, and vendor rate databases.
  • Assist with change order analysis , validating scope adjustments and cost impacts.
  • Ensure all estimates comply with company standards, safety requirements, and client expectations .
  • Participate in site visits and pre-bid meetings to gather technical and logistical details.
  • Contribute to process improvements that increase estimating accuracy and efficiency.

Stand Out From the Crowd

Upload your resume and get instant feedback on how well it matches this job.

Upload and Match Resume

What This Job Offers

Job Type

Full-time

Career Level

Entry Level

Education Level

Associate degree

Number of Employees

1,001-5,000 employees

© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service