Asset Planning provides the cost-effective engineering solutions needed for upgrading, expanding, repairing, maintaining and reliably operating the power system assets safely, efficiently, and in full compliance with state and federal regulatory requirements. This job entails analyzing Oncor’s transmission system using computer simulation to determine the system’s performance under both existing and expected future conditions. Projected performance is compared to Reliability Standards established by the North America Electric Reliability Corporation (NERC) and the Electric Reliability Council of Texas (ERCOT) to ensure proper operation. If performance is unacceptable, construction projects to upgrade the system or changes in operation are developed and proposed to management for approval. This position also initiates projects to support transmission operations, to serve new Oncor and customer-owned substations and to connect new generating stations. Approved projects are monitored and supported through the design, regulatory approval from the Public Utility Commission of Texas (PUCT) and construction phases.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level