About The Position

Every day at CMTS, we undertake impactful infrastructure projects that positively impact lives and communities. CMTS has an extensive 40-year industry experience, which ensures a strong foundation for ongoing success. Our company values employees by fostering a culture of learning, personal development, and well-being. We prioritize work-life balance and ethical business practices and engage with our community through employee-driven initiatives. Join us on our journey of growth and success! We’re currently seeking a highly motivated Energy Marshal – Data Center Critical Infrastructure located in Malaga, WA.

Requirements

  • Minimum 5+ years of experience in construction safety, electrical systems, commissioning, or energy isolation on large-scale industrial or data center projects.
  • Strong working knowledge of OSHA regulations, NFPA 70E, and lockout/tagout requirements.
  • Demonstrated experience managing energized systems in mission-critical facilities.
  • Ability to read and interpret electrical one-lines, schematics, and construction documents.
  • Excellent communication skills with the ability to enforce authority in high-risk environments.
  • Proficiency with documentation, permitting systems, and digital reporting tools.

Nice To Haves

  • OSHA 30 (Construction);
  • NFPA 70E;
  • Certified Energy Control Professional (CECP) or equivalent

Responsibilities

  • Act as the primary authority for energy control on-site, including electrical, mechanical, hydraulic, pneumatic, and thermal systems.
  • Develop, review, and enforce Energy Control Procedures (ECPs) and Lockout/Tagout (LOTO) plans for all applicable systems.
  • Coordinate and authorize all energization, de-energization, and re-energization activities during construction and commissioning.
  • Verify zero-energy states prior to work and ensure proper isolation boundaries are established and maintained.
  • Review method statements, job hazard analyses (JHAs), and energization plans for compliance and risk mitigation. Coordinate closely with construction managers, commissioning agents, electrical contractors, safety teams, and client representatives.
  • Maintain detailed documentation, logs, permits, and approvals related to energy control activities.
  • Conduct field audits, inspections, and spot checks to ensure adherence to approved procedures.
  • Lead or participate in pre-task planning meetings and toolbox talks related to energized work.
  • Stop work immediately if unsafe conditions or unauthorized energy activities are identified.
  • Support incident investigations and corrective action implementation related to energy control issue
  • Experience serving as an Energy Marshal or energization authority on data center or mission-critical construction projects
  • Strong knowledge of hazardous energy control, LOTO, NFPA 70E, and OSHA requirements- Ability to develop, review, and enforce Energy Control Procedures (ECPs)
  • Experience coordinating energization, de-energization, and commissioning activities
  • Proficient in reading electrical one-lines, arc flash studies, and construction drawings Proven ability to assess risk, review JHAs/method statements, and enforce safe work practices- Confident field presence with authority to stop work for unsafe conditions
  • Strong communication skills when coordinating with owners, contractors, and commissioning teams- Detail-oriented with experience maintaining energization logs, permits, and compliance records
  • Familiarity with mission-critical systems (switchgear, MV/LV distribution, UPS, generators)
  • Comfortable working in fast-paced environments with critical energization milestones

Benefits

  • CMTS LLC offers 100% company-paid medical, dental, vision, 401k, life, and long-term disability insurance coverage for employees.
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service