The ELECTRICAL CONTROLS ENGINEER is an integral person in helping our customer’s vision for an automated storage solution from Movu US come to life. The core objective is to support Sales and Engineering during the pre-sale phase by answering questions on system integration. And to support project execution by designing, testing, troubleshooting, and supporting product implementation and system integration. Solutions: Fully automated storage solutions including pallet shuttles (atlas), tote shuttles (eScala), as well as automated mobile robots (iFollow) and ancillary systems such as conveyors and lifts. Customers: End users are located throughout the United States and Canada. We work with many of the leading integrators as our Sales partners. As our ELECTRICAL CONTROLS ENGINEER, you… support Sales, Engineering, Project Management, and Commissioning by sharing your expertise of the final installation and system integration support the creation of the functional description specifications regarding the installation of electrical equipment and the commissioning of controls draft documentation such as SOPs and contribute to creating manuals develop and design electrical cabinets create schematics and network diagrams design controls algorithms and safety systems program device communication of pallet conveyance and pallet inspection equipment test and troubleshoot mechanical and electrical systems and processes work closely with R&D source external vendors for materials lead engineering and automation teams through concept planning, configuration, and development contribute to the creation of risk assessment documents that identify hazards in a system optimize the system by offering simulation support support the Sales Engineering team with product testing contribute to the mechanical system layout drawings regarding all electrical and controls specifications including cable routing contribute to the development of test plans alongside the Commissioning Team make Full Load Amps calculations ensure UL listed components are selected and cabinet is assembled compliant to such standards be present on-site at First Power Up to make sure everything is operational after rack installation and to make sure everything is functional before our robots are commissioned be present on-site when commissioning is in final stages to prepare the Movu system for handover to the end-customer perform Site Acceptance Testing