Construction Manager

AFL TelecommunicationsAshburn, VA
Onsite

About The Position

AFL provides industry-leading fiber optic products and services across the globe. Founded in 1984, the company now manufactures over two thousand products, employs over 5,000 associates, and consistently generates annual sales in excess of a billion-dollars in revenue. AFL is committed to professional growth and employee development. The Data Center Construction Manager leads fast-paced infrastructure build-outs, upgrades, and expansion projects within hyperscale, enterprise, and colocation data centers. This role involves executing project plans by coordinating and scheduling assignments, managing materials logistics, equipment, contractors, and tools to deliver projects on time and within budget. The position requires proactive communication, detailed planning, and strong collaboration with both internal and external stakeholders. It is a key leadership role responsible for ensuring all construction and installation activities meet customer expectations, data center standards, and compliance requirements.

Requirements

  • Proven success leading high-performance teams in mission critical environments.
  • Ability to interpret technical data to drive decision-making and project outcomes.
  • Skilled at building consensus, anticipating issues, and resolving onsite conflicts.
  • Able to manage multiple competing priorities with strong execution discipline.
  • Effective at communicating plans, interpreting policies, and presenting updates to stakeholders.
  • Able to work in cross functional environments and demonstrate strong team leadership.
  • Associate degree in a related technical field, or five (5) years equivalent experience in data center or mission-critical facility construction/management.
  • Strong technical background in data center infrastructure, including electrical, mechanical, and structured cabling systems.
  • Familiarity with IT, networking, and data center architectures.
  • Ability to think critically, problem solve, and make sound decisions under pressure.
  • Ability to handle sensitive information with discretion.
  • Strong organizational skills and attention to detail.
  • Exceptional written and verbal communication abilities.
  • Working knowledge of AC/DC power systems, UPS systems, battery strings, generators, and -48Vdc power.
  • Demonstrated proficiency in at least one area: structured cabling, fiber splicing/testing, electrical/conduit installation, mechanical systems, or equipment commissioning.
  • Working knowledge of test equipment including OTDR, power meters, fiber certification testers, thermal imaging tools, circuit analyzers, and other commissioning gear.
  • Must be authorized to work in the United States.

Nice To Haves

  • Current industry certifications preferred (e.g., BICSI, OSHA, PMP, Data Center ops certifications).

Responsibilities

  • Reports directly to the Operations Manager and leads onsite construction and installation teams.
  • Coordinates day-to-day activities for electrical, mechanical, cabling, commissioning, and general construction crews.
  • Conducts daily safety briefings, JSA’s, toolbox talks, and enforces adherence to all site safety requirements.
  • Oversees the installation and integration of data center systems including: rack/stack hardware, structured cabling, fiber systems, PDUs, busway, grounding, containment systems, HVAC components, and power distribution equipment.
  • Leads crews through complex tasks on active data center floors and equipment rooms.
  • Evaluates test results, troubleshoots infrastructure faults, responds to trouble tickets, and supports maintenance activities.
  • Conducts site surveys, quality assurance reviews, punch-list walkdowns, and verifies construction meets design and customer standards.
  • Prepares daily/weekly progress reports, feasibility assessments, and project documentation.
  • Manages material procurement, storage, and onsite logistics.
  • Ensures all installation work aligns with engineering drawings, MOPs, and data center operational requirements.
  • Collaborates with electrical, mechanical, network engineering, commissioning agents, and facility operations to identify and resolve issues.
  • Provides customer support, including direct communication during builds, guidance on issue resolution, and management of customer expectations.
  • Ensures compliance with company Environmental, Health & Safety (EHS) policies.

Benefits

  • Commitment to professional growth and employee development

Stand Out From the Crowd

Upload your resume and get instant feedback on how well it matches this job.

Upload and Match Resume

What This Job Offers

Job Type

Full-time

Career Level

Manager

Education Level

Associate degree

Number of Employees

1-10 employees

© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service