Data Center Construction Integration Manager - Constructiv

Generac Power SystemsNorfolk, VA
61d$91,300 - $136,900Onsite

About The Position

We are Constructiv, a Generac Company, empowering your technology through mission critical infrastructure delivery. Our team has over 20 years of technical project delivery experience. During this period, we have established a standard for building the critical power and cooling infrastructure that supports data centers As we continue to expand, Constructiv is building a pipeline of skilled construction professionals for future opportunities in the United States. While we currently do not have immediate openings, we want to connect with talented individuals in the data center construction industry who are open to exploring roles with us when the time is right. Travel: Travel is required – up to 90%. 90% is required due to assignment being on site/physical location, living in temporary housing. Onsite is Monday - Friday with occasional off hours work, nights and weekends as needed. Current focus is on candidates located in the following areas: Phoenix, AZ Ashburn, VA Houston, TX Roles and Responsibilities: Oversee the full integration process post base-building completion to ensure data centers are “Ready for Network Install” (RNI) and “Ready for Server Install” (RSI). Lead cross-functional teams including general contractors, lease providers, and internal stakeholders to meet critical project milestones and handoffs. Manage installation and commissioning (Cx) of network infrastructure systems including WAN, LAN, and WLAN. Ensure compliance with technical specifications and timelines. Actively promote and enforce a culture of safety on-site, ensuring all work is conducted in alignment with established safety protocols. Daily Operations: 45% Onsite fieldwork including site walks, progress checks, and safety meetings with field teams. 55% Documentation tasks including checklists, reports, and milestone tracking using enterprise tools (O365, etc.). Engage with internal teams such as Data Center Operations (DC Ops), End-to-End Delivery (E2E), Security, Engineering, Site Acquisition, and EHS to drive alignment and progress. Track and report on project status, RFIs, constraints, dependencies, and safety compliance. Provide weekly updates in accordance with organizational standards. Meeting project deadlines aligned with business and customer needs. Promoting and maintaining a safe working environment.

Requirements

  • High school diploma or GED required.
  • 5–7 years of experience in data center or mission-critical construction project management.
  • 5+ years in Construction Management, Documentation & Professional Communication & Telecom/Network System Integration
  • Proven ability to lead integration of telecom and network systems in large-scale construction projects.
  • Proficiency in analyzing project schedules and tracking technical scope.
  • Excellent documentation and professional communication skills.
  • Advanced experience with Microsoft Office 365 or equivalent enterprise tools.

Nice To Haves

  • Degree in Construction Management, Telecommunications, Engineering, or a related field.
  • PMP, LEED, or RCDD certification.
  • OSHA 30 and/or NFPA 70E certification.
  • PMI- PMP (Project Management Professional)
  • BICSI- DCDC (Data Center Design Consultant)
  • Uptime Institute ATD (Accredited Tier Designer)
  • Familiarity with commercial lease agreements and associated construction deliverables.

Responsibilities

  • Oversee the full integration process post base-building completion to ensure data centers are “Ready for Network Install” (RNI) and “Ready for Server Install” (RSI).
  • Lead cross-functional teams including general contractors, lease providers, and internal stakeholders to meet critical project milestones and handoffs.
  • Manage installation and commissioning (Cx) of network infrastructure systems including WAN, LAN, and WLAN.
  • Ensure compliance with technical specifications and timelines.
  • Actively promote and enforce a culture of safety on-site, ensuring all work is conducted in alignment with established safety protocols.
  • Onsite fieldwork including site walks, progress checks, and safety meetings with field teams.
  • Documentation tasks including checklists, reports, and milestone tracking using enterprise tools (O365, etc.).
  • Engage with internal teams such as Data Center Operations (DC Ops), End-to-End Delivery (E2E), Security, Engineering, Site Acquisition, and EHS to drive alignment and progress.
  • Track and report on project status, RFIs, constraints, dependencies, and safety compliance.
  • Provide weekly updates in accordance with organizational standards.
  • Meeting project deadlines aligned with business and customer needs.
  • Promoting and maintaining a safe working environment.

Stand Out From the Crowd

Upload your resume and get instant feedback on how well it matches this job.

Upload and Match Resume

What This Job Offers

Job Type

Full-time

Career Level

Mid Level

Education Level

High school or GED

Number of Employees

5,001-10,000 employees

© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service