Bristol Infrastructure Design Services LLC is hiring a Construction Scheduler to provide professional support services to the Department of Navy in Area of Responsibility (AOR). Major Responsibilities Provides assistance and technical guidance to engineers/architects exercising construction oversight and design management of Capital Improvements projects. Routinely communicate and coordinate with other technical and non-- technical NAVFAC personnel within the Facilities Engineering Command. Reviewing the scope of individual projects and proposing reasonable construction durations. Review of Baseline Schedules and monthly contractor updates to determine the validity and conformance to contract requirements. Assist in the validation of impacts to the approved construction schedule. Provide analysis on how the contractor can recover, if at all, from current delays to meet the contract completion date. Develop, maintain, and provide scheduling training to each field office and respective personnel covering the basic understanding of network analysis schedules, critical path method, time impact analysis, baseline, progress, and as-built schedule reviews, guide specifications requirements, and software usage. Provide guidance and training to Design staff in the proper editing and use of the scheduling guide specification for incorporation into contract documents
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
Associate degree