About The Position

Provide inspection services to assigned construction projects, with focus on Electrical Construction. Working in a team environment for assigned projects, must be able to understand technical nature of job tasks including documentation, coordination and close out functions as detailed in organizational processes.

Requirements

  • Journeyman Electrician or Master Electrician Certification/License.
  • 15+ years of experience in construction management, construction discipline and trades or related field.
  • High school diploma/GED.
  • Good communications and analytical skills.
  • Working knowledge of computer systems and integrated software application programs.

Nice To Haves

  • Current license from the Florida Building Code Administrators and Inspectors Board.

Responsibilities

  • Complete daily log of construction reports to document contractor activities including: manpower and heavy equipment on site, actual progress, down days, no excavation days, no manhole entry days, no switching days, acceptance testing and activation results, problem reporting, and non-compliance issues.
  • Make available daily log to the Construction Manager (CM).
  • Witness and document all specified system acceptance testing and mandatory inspection points.
  • Prepare non-conformance reports (NCR) for Government signature to document non-conforming materials or installations.
  • Support partial and final inspections, compile punch lists, and track all open items to completion.
  • Coordinate O&M shop support in support of contractor activities including outages and activation of assigned FSEU, and witnessing acceptance testing of protective systems (specifically fire alarm and fire suppression systems).
  • Keep a log of shop support task counts that have been expended and make log available to the Construction Manager upon request.
  • Coordinate with the NASA Construction Safety and Environmental offices on upcoming field activities.
  • Provide immediate notification of safety and environmental compliance violations to the Construction Manager and impacted offices.
  • Provide a quality check of final marked drawings, submitted by the construction contractor, to verify all changes made during construction have been recorded.
  • Submit to the NASA Construction Contracting Officer (CO) all project documentation (not including shop drawings) including all inspector logs, punchlist records, and correspondence.
  • Participate in Pre-Construction Conference with the prime construction contractor, subcontractors, and NASA organizations involved in the implementation; coordinate and participate in a Partnering Workshop to encourage cooperation and assist in the development of a team approach to issue resolution.
  • Ensure that the construction contractor complies with the defined SOW or specifications included in the contract.
  • Assist the construction contractor and NASA personnel in interpreting technical requirements of the contract scope of work or specifications.
  • Throughout the construction phase, maintain daily communications with the CM regarding construction activities, outages, incidents and other events.
  • Attend weekly status meetings and provide input on progress, status and issues.
  • Maintain a field contract (contract schedule, drawings and specifications) which shows changes (e.g. amendments, RFIs, DWs, changes, letters, etc.) to the contract.
  • Ensure that the construction contractor is maintaining a set of red-lined drawings to reflect the as-built conditions.
  • Inspect the construction contractor’s red-lined documents on a regular basis.
  • Inspectors shall red-line field percentages on Contractor pay requests and initial that the field redlines are up to date.
  • Coordinate the construction contractor’s scheduling of required training for Contractor O&M personnel.
  • Assist the CM with the coordination of commissioning, acceptance and turnover of systems or equipment from the construction contractor to the Government.
  • Inspect/witness all delivered materials and verify their accuracy in accordance with contract documents and approved submittals.
  • Assist the CM in coordination and execution of pre-final and final inspection of the contractor’s work.
  • Prepare detailed punch list and verify that all punch list items have been completed prior to recommending that final payment be processed.
  • Assist the CM in the release of final contractor’s acceptance data packages.