This project involves a large‑scale fiber upgrade within multiple high‑capacity data center environments. The work focuses on replacing existing coax cabling with new fiber infrastructure. Technicians will be responsible for pulling high volumes of fiber, routing it through designated pathways, and performing terminations according to industry standards. Technicians must be able to travel between multiple local data center sites within the region as work is distributed across several facilities. Occasional travel to additional sites in nearby states may also be required based on project workload. This is a 40‑hour per week, Monday through Friday role.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
No Education Listed