About The Site The Renegade Solar Energy Center is a 100 MW-AC solar powered generation facility located in Delta and Marquette County, O&M : 12444 Summer Meadow G 5 Road, Rock, MI 49880 utilizing SMA MVPS 4200-S2-US inverters, NEXTracker NX Horizon XTR trackers, and LONGI LR5-72HBD-550M modules, with an attached substation. Position Overview As a Solar Technician, you will be responsible for assisting in operating and maintaining the facility.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED
Number of Employees
1,001-5,000 employees